| The new 9 Mile Bridge was opened within 65 days of notice to proceed. |
9 Mile Road Bridge
Hazel Park, MI
High Steel fabricated and shipped 317 tons of structural steel for the design-build replacement of the 9 Mile Road bridge at I-75 in Hazel Park, MI. The first shipment of steel arrived at the jobsite just 21 days after notice to proceed.
Read More
|
| The Den Brook bridge was replaced after an accident destroyed the bridge |
I-80 over Den Brook Emergency Replacement
Denville, NJ
When an accident and explosion of a tanker truck resulted in the closure of a four-lane simple-span bridge on Route 80 near Denville, New Jersey, High Steel was called in by the New Jersey Department of Transportation to fabricate steel beams for the replacement.
Read More
|
| The Maryland Route 90 Bridge navigational span was replaced because of concrete corrosion. |
Route 90 over the Assawoman Bay
Ocean City, Maryland
High Steel assisted the Maryland SHA in the emergency superstructure replacement of the navigation span of the Route 90 bridge, a key connector between the Ocean City barrier island and the Maryland mainland. The project was completed three weeks ahead of schedule.
Read More
|
| Completed SEPTA Bridge |
SEPTA Railroad Bridge Emergency Replacement
Fort Washington, PA
High Steel fabricated the steel for the emergency replacement of the flood-damaged SEPTA R5 railroad bridge in Fort Washington, PA.
Read More
|
| The Seven Lakes Drive Bridge was replaced and reopened in 46 days |
Seven Lakes Drive Bridge
Harriman State Park, NY
High Steel worked closely with the NYSDOT to detail, fabricate and deliver plate girders for the replacement of the hurricane damaged Seven Lakes Drive Bridge in just 26 days.
Read More
|
|