Erection Services

High Steel fabricated and erected the CSX railroad bridges over MD450 and Upshur Street

CSX Bridges over MD450 and Upshur Street, Prince Georges County, MD

High Steel fabricated and erected four massive railroad girders for the Maryland State Highway Administration’s $70 million railroad bridge construction project on MD 450 and Upshur Street in Prince George’s County. The project required a total of 749 tons of steel.

Read More

The Veteran's Memorial Gay Street Bridge

Gay Street Bridge, Phoenixville, PA

The nine-span Gay Street Bridge's superstructure design consists of plate girder approach spans and four spans featuring two hinged, steel, open spandrel deck arches with a floor system of rolled beam stringers and floor beams. High Steel provided steel fabrication and erection for the project.

Read More

Curved girder flyover bridges at I-95 / I-695 Interchange

I-95 / I-695 Interchange, Phase 1 Baltimore County, MD

High Steel fabricated and erected over 16,000 tons of structural steel for the Maryland Transportation Authority's $208 Million I-95 / I-695 Interchange, Phase 1 project.

Read More

The newly replaced Rte 22/322 Bridge crosses I-81 (foreground)

Route 322 and Route 22 East Over I-81, Dauphin County, PA

High Steel was awarded an fast-track contract to fabricate the replacement steel for the fire-damaged Route 322 and Route 22 Eastbound Bridge over Interstate 81.

Read More

Aerial view of the Market Street SPUI during construction

SPUI at Market Street Bridge, Williamsport, PA

High Steel fabricated and erected the steel for Pennsylvania's first Single Point Urban Interchange (SPUI) at the Market Street Bridge in Williamsport.

Read More